Skip to Content
WDM ARCHITECTS
Case Studies
  • Portfolio
    • Featured
    • Academic
    • Bank
    • Church
    • Community
    • Healthcare & Senior Living
    • Historical
    • Zoological
  • Case Studies
  • Services
    • Why Choose WDM
    • Architectural Services
    • Interior Design Services
    • Landscape Architecture Services
    • Zoo Design Services
  • Firm
    • About
    • People
    • Newsroom
  • Careers
  • Contact
  • (316) 262-4700
  • 105 N Washington, Wichita, KS 67202
  • Facebook
  • X
  • Youtube
  • Linkedin
  • Case Studies
  • Historical Architecture
  • Historic Orpheum Theatre Restoration
Historical Architecture

Historic Orpheum Theatre Restoration

VillageEast

The Second Century: Rediscovering the Orpheum Theatre

The magic of the Orpheum begins long before the performance starts. From the moment guests step through the doors, every architectural detail builds anticipation, inviting them to leave the ordinary behind and enter a world of wonder.

When the Orpheum Theatre opened in 1922, its soaring interiors, ornate craftsmanship and theatrical atmosphere made the journey to one’s seat as memorable as the performance itself. Over the decades, layers of dust, alterations and changing tastes gradually concealed much of the building’s original character.

Following an extensive restoration, the Orpheum once again delivers a sense of awe that has welcomed audiences for more than a century. Historic architectural details, long hidden from view, have been carefully revealed and restored, allowing visitors to experience the theater much as its original patrons did—while equipping this beloved landmark for a new era of live performances. As the curtain rises once again, beginning with John Legend’s sold-out grand reopening concert, a new generation will discover why the Orpheum has long been one of Wichita’s most treasured cultural landmarks.

OrpheumBar

A Landmark Worth Preserving

Historic buildings survive only if people continue to use and love them.

Bringing a century-old theater into the twenty-first century requires more than restoring historic finishes. It demands a careful balance of preservation and innovation. Every decision must strengthen the theater’s future — creating a venue capable of attracting world-class performances, providing audiences with the comfort and accessibility they expect, and preserving the historic integrity required to qualify for historic tax credits. Together, these priorities ensure the theater remains both culturally significant and financially sustainable.

Opening day, 1922: Ushers dressed as matadors welcomed audiences to the Orpheum, setting the stage for a theatrical experience unlike anything Wichita had seen before.

 

Built for Wonder

“Built in an era of economic prosperity and civic optimism,” the Orpheum Theatre and Office Building represents a transformative period in American popular culture, according to its National Register of Historic Places nomination.

Completed in 1922 at a construction cost of $750,000 (more than $14 million today), the four-story auditorium and seven-story office building represented Wichita’s ambition to create a world-class entertainment destination. From opening night, audiences were transported into an experience unlike anything the city had seen before.

John Eberson, Orpheum Theatre’s visionary architect

That experience was shaped by visionary theater architect John Eberson, whose atmospheric theaters transformed traditional auditoriums into immersive environments. The Orpheum was among his early examples, inspired by a Spanish courtyard complete with ornate architectural details, a painted sky ceiling and the illusion of an outdoor setting. By combining artistry with practical innovation — including mass-produced plaster ornamentation and concealed building systems — Eberson created dramatic spaces that were both memorable and economical to construct. He would go on to design more than 100 atmospheric theaters across North America; today, only 17 remain in operation, with the Orpheum as the last to be renovated.

After surviving changing entertainment trends, decades of use and the threat of demolition, the Orpheum was saved by the Orpheum Performing Arts Center, Ltd. in 1976. Their decades of stewardship kept the theater alive, but by 2023 the century-old landmark required a comprehensive restoration to preserve its historic character while adapting it for future generations.

Explore the Orpheum’s complete history → https://wichitaorpheum.com/history

Orpheum Exterior
Orpheum 1
Orpheum 2
Orpheum 6

Investigation: Uncovering the Hidden Orpheum

Restoring a century-old theater begins with understanding how it was built, how it evolved and how it must perform in the future. Before design began, WDM Architects assembled a multidisciplinary team of structural, mechanical and electrical engineers from MKEC Engineering. Together they worked along side the theatrical consultant, Schuler Shook, acoustic consultant, Saunders & Associates, and decorative painter, Conrad Schmitt Inc. The team investigated every aspect of the Orpheum—from concealed infrastructure to fragile decorative finishes.

No crawl space was too confined, no tunnel too dark and no space above the stage too high to explore.

Stan Jeff
Above Grid Iron
Doghouse
Attic
Above The Stage
Ladder
Tunnel

Behind the walls and above the ceilings, the team uncovered the unique challenges of a 100-year-old performance venue. During an attic investigation, Russ Redford, structural engineer with MKEC, discovered an unusual concrete pan joist roof structure rarely seen in theaters of this era.

“I’ve never seen 100-year-old concrete pan roof joist structure in a theater, and riveted trusses too. Typically, it’s steel truss with wood two-by joists. That’s a lot of labor—a lot of work!”

The discovery revealed the craftsmanship invested in the original construction while creating new challenges for integrating modern systems. Richard Bartlett, mechanical engineer with MKEC, immediately began studying how new air handling equipment could be introduced into the attic without damaging decorative plasterwork and the theater’s iconic star lights. Geoffrey Huff, also with MKEC, noted another glimpse into the building’s history: “Every single fixture is still fed with the original old cloth wiring.”

Detail
Visible termite damage in wood composite spindles

The investigation extended beyond structure and systems to the theater’s architectural finishes. Paint analysis, plaster studies and historic research helped identify original colors, materials and restoration priorities. A 2002 Color Study documented the effects of decades of water infiltration, repainting and accumulated dirt, noting that some samples contained “as many as eight layers of paint” and that plasterwork showed “the accumulation of a great deal of dirt.”

Because the Orpheum was designed as an immersive performance environment, acoustics were a critical component of the restoration. Acoustic consultant Melvin Saunders of Saunders & Associates evaluated reverberation, mechanical noise and audience experience, identifying noise concerns.

“The biggest complaint is noise from concessions,” Saunders noted.

Luke Scott, AIA, WDM principal and design team leader, recalled the impact: “It’s so bad that at one point a comedian stopped his show to ask people to quiet down up there.”

Acoustic Testing: Measuring the Invisible
What is pink noise? Melvin Saunders described using pink noise as “equal energy at all octaves. It sounds like radio static with a deep base.” Techs went around the auditorium with a microphone to record the numbers while the pink noise and loud sweeps are playing. The resulting report outlines a comprehensive analysis showing the reverberation time was around 1.5 seconds, which is longer than the ideal for the theater’s primary uses. The report further offered recommendations to improve the theater’s acoustics by choosing certain features on the new seating, addressing mechanical noise and adding acoustical treatments to various surfaces to reduce reverberation time and improve sound quality.

The theater consultant also evaluated performance systems, including replacing some of the outdated hemp rope and sand-bag rigging with modern motorized systems, expanding the number of line sets, upgrading LED lighting and improving integrated lighting controls.

The result was a restoration guided by evidence — not assumptions. Through detailed investigation and collaboration among specialists, WDM and the project team uncovered the information needed to preserve the Orpheum’s past while preparing it for another century of performances.

Examining Fire Curtain
Seating Retreat
Luke Investigating

Reimagining the Auditorium Floor

Perhaps the project’s greatest design challenge lay beneath the audience’s feet. Over a century of use, the Orpheum’s main floor had retained its original bowl-shaped profile, curving both front-to-back and side-to-side. In some locations, the slope reached nearly 17 percent—well beyond modern accessibility and safety standards. The Orpheum’s own Request for Qualifications acknowledged that “the current rake of the floor is very steep at the back,” identifying the auditorium floor as one of the project’s highest priorities.

Flattening the auditorium floor seemed like the simplest solution. However, raising the floor enough to meet modern accessibility standards would have cut into the lower portions of the theater’s Spanish village façades, permanently altering one of the Orpheum’s defining architectural features. As the implications became clear, Orpheum Board member Kristen Bayer worried that some alterations could be “frankensteining her.”

 

 

Using a detailed 3D model, WDM evaluated multiple floor configurations, balancing accessibility, sightlines, seating capacity, historic character and compliance with the Secretary of the Interior’s Standards for Rehabilitation. The final design preserved the original bowl-shaped floor in the front of the auditorium while introducing tiered seating only in the steepest rear rows. The hybrid solution improved safety and accessibility without sacrificing the immersive Spanish village setting that makes the Orpheum unique.

When the preferred option was presented, Board member Jeff Van Sickle summarized the consensus: “I’m really pleased with it. It really solves so many problems.”

Like many aspects of the restoration, the final design was not about choosing preservation over modernization — or vice versa. It was about finding the point where both could succeed.

New tiered seating and ADA platforms

Seating2 1660

Restoring the Audience Experience

The Orpheum’s seating reflected decades of resourceful reuse rather than intentional design. The original seats were removed in 1976 as the theater faced demolition. In 2001, the main-floor seats were salvaged from the closing Towne East Square Cinema for just $3 each, while the balcony seats came from Wichita City Hall and another shuttered theater. Although the salvaged seats helped keep the theater operating, neither was designed for the Orpheum. Beyond their narrow width and worn condition, their seat-back angles and viewing geometry forced patrons to crane their necks to comfortably watch the stage — a problem made clear through the design team’s sightline studies.

Orpheum’s recycled seating prior to the restoration

 

 

Replacing the seating proved far more complex than ordering new chairs. The Orpheum’s business model depends on maintaining approximately 1,286 seats, a capacity that attracts touring productions and supports concession revenue. Every additional inch of seat width or legroom risked reducing that number. With hundreds of options for chair geometry, finishes, durability and historic appearance, WDM led a dedicated seating retreat to compare manufacturers, mockups and layouts before narrowing the field. The final seating plan delivers dramatically improved comfort and sightlines while preserving the capacity essential to the theater’s long-term success.

 

Alcover B4 After
Then & Now: Historic photographs helped guide the restoration of the Orpheum’s decorative details—including the placement of two distinct vases flanking the auditorium. Over the years, the vases had switched sides. During restoration, they were returned to their original locations, restoring a detail that had gone unnoticed for decades.

Rediscovering the Original Palette

For decades, layers of repainting and accumulated dust had muted the Orpheum’s vibrant interiors, leaving little indication of what once graced Eberson’s design. The paint analysis performed by Conrad Schmitt Studios uncovered evidence of the theater’s original polychromatic palette. Beneath as many as eight layers of paint, conservators found metallic gold finishes, green acanthus leaves, blue architectural details and even traces of the original red berries that had later been painted over. Rather than simplifying the restoration with a monochromatic finish, the Orpheum chose to faithfully recreate the original multicolored scheme.

Those discoveries informed every subsequent design decision. WDM interior designer Angi Womeldorff, IIDA, NCIDQ, used the restored color palette to create the overall design for the interior of the space, including the seating and custom colored carpeting.  Each color in the carpet was carefully selected to compliment the original vision while creating a cohesive interior for the theater’s second century.

 

From Demolition to Restoration

When the Orpheum went dark in June 2025, the transformation began from the ground up. Eby Construction’s first task was removing the theater’s existing seats and demolishing the worn auditorium flooring. In the steepest upper rows, the original floor was removed and new concrete tiering was constructed to create a safer, more consistent seating platform while preserving the character of the historic auditorium. Meanwhile a “runway” was constructed at the balcony to facilitate the installation of new air handling units and ductwork in the attic. Once the major floor work was complete, an enormous scaffold structure was erected throughout the auditorium. Its uppermost level—the “dance floor”—created a safe, elevated work platform where decorative painters and plaster workers could reach the ceiling and upper walls. Working from this temporary structure, specialists cleaned, repaired and restored the Orpheum’s ornate historic plasterwork and decorative finishes.

Chairs Loose
No Chairs
20251016 164251987 IOS
20251030 162753570 IOS
Angi Scaffolding
Dance Floor

The Scaffolding: Construction Progress

There Are No Small Decisions

Historic restoration demands patience as much as expertise. Reaching the Orpheum’s decorative plasterwork required an immense scaffold structure weighing nearly 156,000 pounds, assembled over six weeks from 8,747 individual components. From that temporary platform, artisans restored ornamental plaster, repaired historic finishes and documented details invisible from the floor.

Not every challenge yielded to the first solution. Original exit signs were evaluated one by one to determine whether they could be restored, refurbished or discreetly replicated to satisfy both preservation goals and life-safety requirements.

 

By the Numbers

  • 8,747 individual scaffold components

  • 155,850 pounds of scaffolding

  • 2,400 linear feet of planking

  • 6,480 SF of plywood

  • 3,620 labor hours

  • 6 weeks to erect

  • 3 weeks to dismantle

IMG 6976
20240124 164933675 IOS
20250724 163823092 IOS
Star Hole Flagging
20250909 152131
Orpheum StarCeiling

Bringing Back the Night Sky

One of the Orpheum’s most enchanting features has always been its atmospheric ceiling—a painted night sky illuminated by tiny twinkling stars. The starlight effect was originally created by hooded incandescent fixtures located in the attic and aligned over holes in the plaster ceiling above the Spanish courtyard–themed area. Before the renovation, the original star lights were no longer bright and many didn’t shine at all.

Working from the attic above the auditorium, the facilities committee identified each original starlight opening by pushing survey flags down through the century-old plaster ceiling. WDM mapped the locations of the original stars on a reflected ceiling plan. Working together the team added stars to the ceiling to create a more balanced and evenly dispersed arrangement. The restored ceiling now features approximately 125 stars, illuminated by a modern LED and fiber optic lighting system with programmable controls that allow brightness and twinkling effects to be adjusted, preserving the wonder of Eberson’s original design while embracing twenty-first century technology.

 

A Curtain Worth Saving

Hidden in plain sight for decades, the Orpheum’s original fire curtain is both a life-safety device and a work of art. Designed by John Eberson and hand-painted on asbestos canvas by the Fabric Studio of Chicago, it depicts an Andalusian courtyard complete with a Spanish lady and matador. When the century-old curtain was lowered for inspection, the design team was relieved to discover only minor damage. Rather than remove this remarkable artifact, the restoration team found a way to preserve it safely. A new, code-compliant fire curtain was joined to the historic curtain, allowing the original asbestos canvas to be fully encapsulated and safely contained while keeping the hand-painted artwork in place. The new curtain provides the required modern life-safety protection, while the original remains an integral part of the theater’s historic fabric. The solution preserves not only the curtain itself, but a remarkable piece of the Orpheum’s original design for future generations.

 

20260402 160626435 IOS
20260324 083847
20260428 143050
20260428 153526

Setting the Stage for Comfort

Once the restoration of plaster walls and ceilings was complete, the enormous scaffold was carefully dismantled, opening the auditorium for the next phase. New wood flooring was installed, then sanded, stained and finished—a challenging process given the floor’s complex, bowl-shaped geometry. By February 2026, the completed floor was ready for a final check: the chair manufacturer scanned the surface to verify the seating layout against actual conditions. The review prompted adjustments to the chair plan before installation could begin, ensuring the final arrangement balanced capacity, sightlines, accessibility and comfort. Each phase depended on the one before it, making construction itself a carefully choreographed part of the restoration. Even as the project neared completion, the demands of a 104-year-old theater called for careful coordination down to the last detail.

OrpheumFoyer

Designing for Flexibility

WDM also worked with Orpheum management to make the building more adaptable to the needs of different performances. At the base of the grand stairs in the foyer, a new flexible service area can function as a merchandise station for T-shirts and show memorabilia or become an additional concession area. Custom casework on casters allows the space to be reconfigured for each event. A new control booth was also created directly behind the ADA seating at the top of the main-floor seating area, providing a dedicated vantage point for controlling a new array of stage lighting and giving operators direct access to the theater’s upgraded lighting systems.

OrpheumConcessions 1
OrpheumMezzanineConcession 1
OrpheumMezzanineConcession 4
Crowd
Record-breaking crowd lines up to the grand re-opening of the Orpheum

A New Beginning

After 15 months of being closed for construction, the moment came everyone had been waiting for.

The Orpheum reopened with a sold-out performance by EGOT-winning artist John Legend, marking the beginning of the theater’s next chapter.

“Tickets moved faster than anything we’ve seen in over a decade, which is a real testament to how excited this community is about the Orpheum Theatre’s return,” said Mallory Rine, the theater’s director of marketing and booking.

The response went far beyond a successful opening night. At a private preview, Kansas Senator Oletha Faust Goudeau described the experience of walking into the restored theater as something she could “feel immediately,” adding that she felt “proud and inspired” knowing Wichita’s history had been preserved for generations to come.

For Orpheum Executive Director Stacee Olden, that sense of connection is the heart of the project. “It’s more than a beautiful piece of artwork,” she said at the rededication. “It’s a reminder that great cities don’t simply preserve their history, they build upon it.”

After 104 years, the Orpheum is doing exactly that.

Measure of Success

“WDM has also demonstrated outstanding creativity and problem-solving in addressing the challenges of a 100-year-old theater. From rethinking the sloped auditorium floor to devising innovative mechanical, lighting, rigging, and acoustic solutions within tight historic constraints, their team consistently brings forward thoughtful, buildable concepts that strengthen both patron experience and operational efficiency. Their ability to coordinate with a first-rate team of specialists-including acousticians, theatrical consultants, engineers, and decorative paint conservators is highly admired.” — Stacee Olden, Executive Director, Orpheum Performing Arts Center

Project Statistics

Project Location

200 North Broadway, Wichita, Kansas

Year Built

1922

Restoration Finished

2026

Area

15,000 s.f.

Seats

1257 plus 12 wheelchair spaces and 12 companion seats for a total of 1281

Project Team
Architect - Project Lead

WDM Architects Luke Scott, AIA Stan Landwehr, AIA Angi Womeldorff, IIDA, NCIDQ Jason Harlan

Engineer

MKEC Engineering

Theater Consultant

Schuler Shook

Acoustical Consultant

Saunders & Associates

Historic Paint and Plaster Restoration Consultant

Conrad Schmitt Studios

General Contractor

Eby Construction Company

Before and After Gallery

Two column image

FromStage-B4
From-Stage
Foyer-B4
Foyer
Stage
Stage-After
Seats2-B4
seats
Lighting-b4
Lighting
mezzanineConcession-B4
MezzanineConcession
GreenRoom-B4
GreenRoom
StageRail-B4
StageRail

Related

View All Historical Architecture
  • Case Study: Historical Architecture

    Historic Orpheum Theatre Restoration

  • Case Study: Historical Architecture

    Evergy’s Wichita Service Center

Connect With Us

Creating your vision starts with a conversation. Call (316) 262-4700 or send us a message now.

Tell Us About Your Project
WDM Architects
(316) 262-4700 105 N Washington, Wichita, KS 67202
  • Facebook
  • X
  • Youtube
  • LinkedIn
  • AIA AIA
  • Association of zoos Aquariums Association of zoos Aquariums
  • U.S Green Building Council U.S Green Building Council
  • AZFA AZFA
  • KHTA KHTA
  • Copyright © 2026 WDM Architects. All rights reserved.

  • Website by Cassandra Bryan Design

    • Privacy Policy
    • Terms of Use